Coastal Marine Group launches a framework to align docks, seawalls, and lifts, improving planning, permitting, and project delivery in Southwest Florida.
CAPE CORAL, FL, UNITED STATES, February 19, 2026 /EINPresswire.com/ — Coastal Marine Group, a Cape Coral-based marine construction company serving Southwest Florida, today announced the launch of its Integrated Waterfront Builds Framework, a project-planning and delivery approach that coordinates docks, seawalls, boat lifts, and marine utilities into a single system. The framework addresses the growing demand among dock building contractors and waterfront property owners for predictable timelines, fewer scope conflicts, and build decisions that withstand daily use and coastal conditions.
Coastal Marine Group is scheduling design consultations and dock inspection services for 2026 projects. Consultation requests can be made by phone at (239) 372-4586, by email at office@cmgdocks.com, or in person at 424 Southeast 47th Terrace, Unit A, Cape Coral, FL 33904 during Monday–Friday business hours (8 AM–5 PM). Additional company information is available at https://coastalmarinegroup.net/.
Integrated waterfront builds have become a notable trend in coastal markets where shoreline infrastructure must perform across changing water levels, heavy use, and storm exposure. As modular marine systems expand, contractors are also weighing material choices to reduce long-term maintenance costs. A November 2025 industry overview in Pile Buck Magazine notes that marine contractors continue to favor aluminum for its corrosion resistance, modular fabrication advantages, and strength-to-weight efficiency in applications such as docks and gangways.
The Integrated Waterfront Builds Framework formalizes how Coastal Marine Group scopes and sequences projects so each component supports the next. The company’s process centers on early site evaluation and design guidance, permitting coordination, fabrication-focused quality control, and a final walkthrough at handoff—steps that are also reflected in the company’s published dock services overview.
As part of the new framework, Coastal Marine Group organizes integrated builds around four practical priorities:
– System-first layout and loads. Docks, lifts, and seawall transitions are planned together so boarding, tie-up forces, and day-to-day foot traffic align with the intended use (boating access, fishing space, swimming entry, or entertaining). This helps reduce common “after-the-fact” changes that can impact both schedule and cost.
– Marine-grade materials matched to the site. Frame, decking, hardware, and piling details are selected to fit local exposure, corrosion risk, and maintenance expectations—whether a project calls for aluminum, steel, wood, or composite elements.
– Permitting readiness and documentation. Integrated builds often involve multiple constraints simultaneously, including navigable-water considerations and local shoreline rules. Coastal Marine Group’s framework emphasizes early documentation and review, so permitting steps are less likely to stall at the point of construction scheduling.
– Resilience and responsible construction practices. Coastal resilience organizations have continued to publish best-practice guidance to reduce storm damage and marine debris from failed structures. The North Carolina Coastal Federation’s Resilient Docks & Piers Toolkit highlights design, permitting, and material considerations that can improve durability and reduce environmental impact.
Coastal Marine Group’s service portfolio includes dock construction (including floating docks and dock extensions), boat lift installation and repair, seawall construction and repair, dredging, piling installation and services, dock safety upgrades, storm damage dock repair, and marine electrical and plumbing. The company also offers a showroom experience for design consultations, with walk-ins welcome and scheduled appointments available during business hours.
The company stated that the framework is being applied to new construction and retrofit projects across Cape Coral and surrounding Southwest Florida communities, including homeowners upgrading older dock systems and property owners planning coordinated improvements that combine docks, seawalls, and lift functionality.
About Coastal Marine Group
Coastal Marine Group is a marine construction and dock building company headquartered at 424 Southeast 47th Terrace, Unit A, Cape Coral, FL 33904. The company provides dock construction, boat lifts, seawalls, dredging, piling services, and waterfront upgrades for residential and commercial properties in Cape Coral and surrounding communities across Southwest Florida. Coastal Marine Group’s tagline is “Crafted with Precision. Anchored in Integrity.” For more information, call (239) 372-4586.
Press Room
Coastal Marine Group
+1 (239) 372‑4586
email us here
Visit us on social media:
Instagram
Legal Disclaimer:
EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.
![]()




































